Prologis Zanker Road Data Center | San Jose, CA

Prologis Zanker Road is a planned data-center campus in Santa Clara County, California.

The campus has 2 buildings. Prologis Zanker Road - Building 1 is listed at 99 MW, planned, at 37.42532, −121.92959. Prologis Zanker Road - Building 2 is listed at 99 MW, planned, at 37.42545, −121.92777. Reported campus capacity is 198 MW. All 2 buildings are planned.

Terra is a planned campus in the same county. Tract South Valley is a planned campus in Storey County, Nevada. PowerHouse Reno is a planned campus in Washoe County, Nevada.

Santa Clara County is at the south end of San Francisco Bay and contains San Jose. Zanker Road runs north–south through the Alviso and North San Jose industrial district between First Street and the Coyote Creek. Montague Expressway and Highway 237 cross that grid. The mapped buildings sit on Zanker Road in that north San Jose belt. Mineta San Jose International Airport is immediately west. The Alviso sloughs and the bay salt ponds lie to the north. Santa Clara and Milpitas adjoin the same industrial edge.

Capacity 198 MW reported. Status planned. City San Jose. County Santa Clara. State CA. Grid .

Buildings

Related

Sources