Switch Tahoe Reno Citadel Campus Data Center | Storey County, NV

Switch’s Citadel Campus in Tahoe Reno, Nevada, is the company’s exascale colocation campus in the Tahoe-Reno Industrial Center. Switch describes the campus as having gigawatts of power capacity upon completion and lists 100 percent green power, a 100 percent power uptime guarantee, and up to 2 MW per cabinet. The company’s Tahoe Reno page places the campus on a dedicated fiber path to Switch’s Core Campus via the SUPERLOOP, with about 4.5 milliseconds to the Bay Area. The same page calls the completed campus the world’s most powerful colocation data center campus and lists a dedicated 7-millisecond fiber path to the Core Campus. Switch also lists 2 percent Nevada sales-and-use tax and a 75 percent personal-property-tax reduction. The mapped buildings sit inside that industrial park east of the Tract South Valley campus area, on the same high-desert industrial bench that hosts other large Tahoe-Reno data-center pins. Switch’s Tahoe Reno materials name the Citadel Campus as the exascale follow-on to the Core Campus, with SUPERLOOP fiber, a 100 percent uptime guarantee, and published tax treatment of 2 percent sales-and-use tax plus a 75 percent personal-property-tax reduction. The public map pins three planned Citadel halls totaling 354 MW inside that campus.

The public map lists 3 buildings. Reported campus capacity is 354 MW. All 3 buildings are planned.

Capacity 354 MW reported. Status planned. City . County Storey. State NV. Grid .

Buildings

Sources